Saint Paul's Sales Tax Revitalization (STAR) program provides grants and loans for commercial, mixed-use, and neighborhood improvement projects. Applications accepted annually.
Saint Paul — STAR Program ↗Signals are based on public datasets; program eligibility requires verification.
2 permits on record since 2016 · $559K total declared value · Most recent: Aug 2017 (fire engineering)
JOHNSON CONTROLS FIRE PROTECTION LP
JOEY PERELL / MATT GRUNTNER RICE LAKE CONSTRUCTION GROUP
Source: Saint Paul open data. Declared construction values are applicant-reported and may not reflect actual project cost.
Southeast Community Organization · Saint Paul
ACS rents reflect current tenant leases and may differ from new market rents.
Source: 2022 ACS 5-Year Estimates · Census Tract 9800
General Industrial — medium-intensity manufacturing and processing
Setbacks
Estimated Buildable Footprint
Estimates based on typical zoning setbacks. Actual requirements may vary by lot, overlay, or conditional approval.
Back-of-envelope estimate based on mid-rise concrete (50+ units) benchmarks for 158,846 sqft buildable area.
| Address | Owner | Class | Assessed Value | Distance |
|---|---|---|---|---|
| 0 UNASSIGNED | CHICAGO AND NORTHWESTERN RY | RAILROAD REAL PROP USED IN OPERATION | $829,800 | 308 ft |
| 2898 CHILDS RD | NORTHERN STATES POWER CO | COMM LD&IMPRO OWN BY PUB UTI TH RAIL | $445,700 | 675 ft |
| 0 UNASSIGNED | METRO WASTE CONTROL COMM | EXEMPT PROP. OWNED BY MET COUNCIL | $3,704,400 | 759 ft |
| 0 UNASSIGNED | METROPOLITAN WASTE CONTROL | EXEMPT, VACANT LAND | $4,585,200 | 919 ft |
| 0 PIGSEYE LAKE RD | METRO WASTE CONTROL COMMISSION | EXEMPT PROP. OWNED BY MET COUNCIL | $2,398,000 | 1,114 ft |